Garments education always share about IE, Planning, Merchandising, Production, Quality, Washing, IE Math Solution and garments industry related content. Here I discussed about smv, sam, work study, method study, motion study, work measurement, time study, production sop,operation breakdown, Ie responsibility, thread consumption, ie math question sotution, costing, cutting sop, Job responsibility, quality, quality sop, cutting defect, sewing defect, study work, six sigma, 7 Qc, 7 wastage, 6s etc

Sunday, June 11, 2023

What is IE or Industrial Engineering?

                               

IE means Industrial Engineering. Industrial Engineering is a branch of Engineering which are always work for organization about profit optimize by increasing

productivity and development.

Increase productivity tools:

  • Work study
  • 5s
  • Lean
  • Lean six sigma etc.

Importance of Industrial Engineering in Garments Industry:

01. Synchronize and Optimize about 4M:
  • Man
  • Machine
  • Material
  • Method
02. Analyze sample.: 
  • New sample development and simplify process.
  • Method improvement.
  • Analysis risk factor.
  • Discuss to pp meeting about sewing operation.
03. Making this related document: 
  • Make Operation breakdown.
  • Make daily line efficiency.
  • Record non productive time.
  • Find out product smv.
  • Thread consumption.
  • Garment cm calculation.
  • Make line layout.
  • setup line target.
  • Line balancing.
  • New worker assessment.
  • Weekly and monthly performance reports
  • Factory KPI
  • Operator Incentives plan.
04. Identifying the problem:
  • Remove Bottleneck operation.
  • Make department wise manpower requirement and allocation.
  • Reduce wastage and non-value adding activities.
  • Make Man and machine requirements for existing and upcoming style.
05. Monitor to production floor:
  • Monitor Hourly production and line WIP.
  • Find out Productivity and Efficiency.
  • Make factory loss-Profit report.
  • Monitor the production by developing process and operator skill.
  • Reduce excess overtime and Labor cost.
  • Worker absenteeism and turnover
06. Coordinate to planning & Marchant:
  • Collect Plan from planning department to follow-up and achieve.
  • Coordinate With merchandizer regarding new style.
07. Follow up to factory floor:
  • Factory processes
  • Product quality
  • Worker safety
  • Ergonomic work place
08. Improvement About:
  • Garments operation.
  • Working method
  • Improve Layout design.
  • Operator motion study
  • Garments quality improve.
09. Implement to the floor:
  • Lean & Lean six sigma tools
  • New working method.
  • New improved methods and processes

10. Maintain:
  • Factory cost minimize.
  • Factory all dept. database.
  • 6s and house keeping.
  • Machine profile.
  • Work study (Time study, Motion study, Method study, Production study).
  • Record worker Skill matrix.
  • Make SMV data bank.

No comments:

Post a Comment

Powered by Blogger.

Contact Form

Name

Email *

Message *