Garments education always share about IE, Planning, Merchandising, Production, Quality, Washing, IE Math Solution and garments industry related content. Here I discussed about smv, sam, work study, method study, motion study, work measurement, time study, production sop,operation breakdown, Ie responsibility, thread consumption, ie math question sotution, costing, cutting sop, Job responsibility, quality, quality sop, cutting defect, sewing defect, study work, six sigma, 7 Qc, 7 wastage, 6s etc

Thursday, June 15, 2023

IE math question: Suppose, A sewing line makes two styles, Style-1 and Style-2 of SAM 45 and 53 minutes respectively. The production quantity of Style-1 is 300 pcs and Style-2 is 200 pcs. 85 manpower work full shift of 10 hours. Find out efficiency of the line?

Here I discuss about ie math question. If you pay attention my math solution then you can easily solve math question.

Solution:

                     (Style-1 production x SAM) + (Style-2 production x SAM)

Efficiency=……………………………………………………………………………….. X 100

                                     Manpower x working hour x 60

 

                      (300 x 45) + (200 x 53)

                =……………………………………X 100

                              85 x 10 x 60

 

                                   13500 + 10600

               =………………………………...... X 100

                                   51000

 

                                   24100

               =…………………………………....X 100

                                     51000

 

                     2410000

                =………………………

                            51000

Efficiency= 47.25% (Answer)

No comments:

Post a Comment

Powered by Blogger.

Contact Form

Name

Email *

Message *