Garments education always share about IE, Planning, Merchandising, Production, Quality, Washing, IE Math Solution and garments industry related content. Here I discussed about smv, sam, work study, method study, motion study, work measurement, time study, production sop,operation breakdown, Ie responsibility, thread consumption, ie math question sotution, costing, cutting sop, Job responsibility, quality, quality sop, cutting defect, sewing defect, study work, six sigma, 7 Qc, 7 wastage, 6s etc

Thursday, June 15, 2023

IE math question: If working time= 60 min., average cycle time= 20 sec., performance rating= 100% and allowance= 20% Then Capacity=? If 20% allowance decreased from working time then Capacity=?

Here I discuss about ie math question. If you pay attention my math solution then you can easily solve math question.

1st Solution:

We know that,

Basic time= Average cycle time x Performance rating

                  = 20 x 100%

                  = 20 sec.

          SMV= Basic Time + (Basic Time x Allowance)

                  = 20 + (20 x 20%)

                  = 20 + 4

                  = 24 sec.

          SMV= 24/60

                  =0.4 min.

   Capacity= 60/SMV

                  =60/.4

                  = 150 pcs (Answer)

2nd Solution:

If 20% decreased from working hour then we get,

                  = 60 – (60 x 20%)

                  = 60 – 12

                  = 48 min.

   Capacity= 48/SMV

                  = 48/.4

                  = 120 pcs (Answer)

 