Garments education always share about IE, Planning, Merchandising, Production, Quality, Washing, IE Math Solution and garments industry related content. Here I discussed about smv, sam, work study, method study, motion study, work measurement, time study, production sop,operation breakdown, Ie responsibility, thread consumption, ie math question sotution, costing, cutting sop, Job responsibility, quality, quality sop, cutting defect, sewing defect, study work, six sigma, 7 Qc, 7 wastage, 6s etc

Monday, June 19, 2023

IE math question: Suppose A line manpower 50, working hour 10, CPM $0.05 then calculate line cost by Taka. [$1=85 taka].


Here I discuss about ie math question. If you pay attention my math solution then you can easily solve math question.
Solution:

Given that,

Manpower= 50

Working hour= 10

CPM= $0.05

Now,

Total working minute= Manpower x working hour x 60

                        = 50 x 10 x 60

                       = 30000 min

 

Line cost= Total min x CPM

             = 30000 x $0.05

             =$1500

             =$1500 x 85  [$1=85 taka]

             =127500 Taka (Answer)

No comments:

Post a Comment

Powered by Blogger.

Contact Form

Name

Email *

Message *