Given that,
Manpower= 50
Working hour= 10
CPM= $0.05
Now,
Total working minute= Manpower x working hour x 60
= 50 x 10 x 60
= 30000 min
Line cost= Total min x CPM
= 30000 x $0.05
=$1500
=$1500 x 85 [$1=85 taka]
=127500 Taka (Answer)Garments education always share about IE, Planning, Merchandising, Production, Quality, Washing, IE Math Solution and garments industry related content. Here I discussed about smv, sam, work study, method study, motion study, work measurement, time study, production sop,operation breakdown, Ie responsibility, thread consumption, ie math question sotution, costing, cutting sop, Job responsibility, quality, quality sop, cutting defect, sewing defect, study work, six sigma, 7 Qc, 7 wastage, 6s etc
Given that,
Manpower= 50
Working hour= 10
CPM= $0.05
Now,
Total working minute= Manpower x working hour x 60
= 50 x 10 x 60
= 30000 min
Line cost= Total min x CPM
= 30000 x $0.05
=$1500
=$1500 x 85 [$1=85 taka]
=127500 Taka (Answer)